Building a New Engine

October 2, 2021

The cab continued the painting process.  The chassis frame arrived.  

September 18, 2021

Painting began on the cab.  The pump house structure was joined with the fire pump.  Painting of the body continued.

September 4, 2021

The fire pump started receiving valves and plumbing.

August 14, 2021

Fabrication of the body completed.

August 7, 2021

The cab moved to staging.  Fabrication of the body continued.  

July 31, 2021

Cab fabrication continued.  The fire pump was moved to staging.

July 24, 2021

The new Pierce apparatus began production in Florida.  Fabrication of the cab and body began; the fire pump arrived.  

 